| 1 | Grinin V.A., Shkarupelov E.S., Kartashov A.B., Gazizullin R.L., Nazarenko S.V. (2023) Determination of rational number of gears of mechatronic transmission by computational evaluation of vehicle loading by driving cycles, Journal of Mining and Geotechnical Engineering, 3(22):16. DOI: 10.26730/2618-7434-2023-3-16-33 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Kuznetsov I.S., Zinoviev V.V., Kuznetsova A.V. (2024) Identification of the type of probabilistic distribution of the main technological processes duration when modeling stripping operations at Kuzbass open-pit mines , Journal of Mining and Geotechnical Engineering, 2(25):79. DOI: 10.26730/2618-7434-2024-2-79-103 | MORE INFO | DOWNLOAD |
| 3 | Zinoviev V.V., Kuznetsov I.S. (2026) The use of computer simulation and animation methods to identify and eliminate “bottlenecks” in the operation of excavator-truck systems, Journal of Mining and Geotechnical Engineering, 3(34):26. DOI: 10.26730/2618-7434-2026-3-26-48 | MORE INFO | DOWNLOAD |
| 4 | Cehlár M., Janočko J., Márasová D., Cagáňová D., Tyulenev M.A., Markov S.O., Bareshova E.I. (2026) Selecting an efficient configuration for excavator-truck complexes in a mining site without changing the total number of transport units, Journal of Mining and Geotechnical Engineering, 3(34):71. DOI: 10.26730/2618-7434-2026-3-71-94 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.