logo

Search of articles

Reset

Search result

Найдено: 4
1Zavyalov V.M., Semykina I.Yu., Abeidulin S.A., Shaitor N.M., Lebedev G.M. (2026) The compensation topologies study of the dynamic wireless charging system for the underground suspended monorail, Journal of Mining and Geotechnical Engineering, 3(34):4. DOI: 10.26730/2618-7434-2026-3-4-25 MORE INFO DOWNLOAD
2Zinoviev V.V., Kuznetsov I.S. (2026) The use of computer simulation and animation methods to identify and eliminate “bottlenecks” in the operation of excavator-truck systems, Journal of Mining and Geotechnical Engineering, 3(34):26. DOI: 10.26730/2618-7434-2026-3-26-48 MORE INFO DOWNLOAD
3Fomin A.I., Gordin S.A., Ushakov E.N., Tatsienko V.P. (2026) Justification for the selection of an optimal design for the executive body of the collecting device of a bremsberg belt conveyor , Journal of Mining and Geotechnical Engineering, 3(34):49. DOI: 10.26730/2618-7434-2026-3-49-70 MORE INFO DOWNLOAD
4Cehlár M., Janočko J., Márasová D., Cagáňová D., Tyulenev M.A., Markov S.O., Bareshova E.I. (2026) Selecting an efficient configuration for excavator-truck complexes in a mining site without changing the total number of transport units, Journal of Mining and Geotechnical Engineering, 3(34):71. DOI: 10.26730/2618-7434-2026-3-71-94 MORE INFO DOWNLOAD

Обложка

This work is licensed under a Creative Commons Attribution 4.0 License.