logo

Search of articles

Reset

Search result

Найдено: 3
1Martyanov V., Kolesnikov V., Lapaev M. (2022) Investigation of drilling and blasting works parameters for the combined technology of open pit mining of inclined deposits, Journal of Mining and Geotechnical Engineering, 3(18):53. DOI: 10.26730/2618-7434-2022-3-53-78 MORE INFO DOWNLOAD
2Samusev P.A., Novinkov A.V., Protasov S.I. (2023) Determination of the range of separate rock pieces movement when exploding borehole ripping charges, Journal of Mining and Geotechnical Engineering, 4(23):4. DOI: 10.26730/2618-7434-2023-4-4-25 MORE INFO DOWNLOAD
3Konstantinov I.A., Talgamer B.L., Starkov A.E. (2024) Analysis of the causes of poor-quality rock destruction by explosion in different mining and geological conditions, Journal of Mining and Geotechnical Engineering, 3(26):22. DOI: 10.26730/2618-7434-2024-3-22-42 MORE INFO DOWNLOAD

Обложка

This work is licensed under a Creative Commons Attribution 4.0 License.