| 1 | Kuznetsov I.S., Zinoviev V.V., Kuznetsova A.V. (2024) Identification of the type of probabilistic distribution of the main technological processes duration when modeling stripping operations at Kuzbass open-pit mines , Journal of Mining and Geotechnical Engineering, 2(25):79. DOI: 10.26730/2618-7434-2024-2-79-103 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Kolesnikov V.F., Litvin Ya.O., Dubinkin D.M., Markov S.O. (2024) On determining the parameters of technological schemes of overburden bench mining by different excavators and dump trucks, Journal of Mining and Geotechnical Engineering, 3(26):99. DOI: 10.26730/2618-7434-2024-3-99-112 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.