| 1 | Ignatov E.V. (2019) The state and main tasks of development of the longwall mining system on the coal mines of Kuzbass: a brief review, Journal of Mining and Geotechnical Engineering, 4(7):30. DOI: 10.26730/2618-7434-2019-4-30-49 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Miliy S.M. (2020) Evaluation of technology for development of inclined and steep coal deposits in Kuzbass, Journal of Mining and Geotechnical Engineering, 1(8):45. DOI: 10.26730/2618-7434-2020-1-45-73 | MORE INFO | DOWNLOAD |
| 3 | Visnap A.A., Tyulenev M.A. (2023) Technological ESG transformation of the surface mining system in the circumstances of an operating mining company , Journal of Mining and Geotechnical Engineering, 3(22):4. DOI: 10.26730/2618-7434-2023-3-4-15 | MORE INFO | DOWNLOAD |
| 4 | Fomin A.I., Grunskoy T.V. , Belkin I.A., Trubitsyn A.A., Trubitsyna N.V., Kopytov A.I., Mikhailov V.G., Tatsienko V.P., Dyrdin V.V. (2025) Study of rock fracturing of the Yaregskoye deposit to normalize the microclimate with the aim of developing compositions for isolating steam outlets, Journal of Mining and Geotechnical Engineering, 2(29):4. DOI: 10.26730/2618-7434-2025-2-4-25 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.