| 1 | Vaneev A.V. (2018) Opening-up scheme with transport jumpers to reduce the overburden and coal transportation distance at Arshanovsky open pit: case study, Journal of Mining and Geotechnical Engineering, 2(2):13. DOI: 10.26730/2618-7434-2018-2-13-35 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Kolesnikov V.F., Janočko J. (2020) On the issue of classification of methods and schemes of quarry fields opening, Journal of Mining and Geotechnical Engineering, 2(9):42. DOI: 10.26730/2618-7434-2020-2-42-74 | MORE INFO | DOWNLOAD |
| 3 | Martyanov V., Markov S., Kolesnikov V., Tyuleneva E., Cehlár M., Janočko J., Márasová D., Cagáňová D. (2021) Study of inclined deposits opening under the combined mining system: Kureinsky area case-study, Journal of Mining and Geotechnical Engineering, 4(15):64. DOI: 10.26730/2618-7434-2021-4-64-88 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.