| 1 | Gerike B.L., Klishin V.I., Gerike P.B., Mokrushev A.A. (2018) Intelligent service of reducers of mining machines, Journal of Mining and Geotechnical Engineering, 1(1):19. DOI: 10.26730/2618-7434-2018-1-19-34 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Gerike B., Sushko A., Gerike P. (2018) Introduction of digital technologies in the field of technical diagnostics, maintenance and repair of mining machinery and equipment, Journal of Mining and Geotechnical Engineering, 3(3):19. DOI: 10.26730/2618-7434-2018-3-19-28 | MORE INFO | DOWNLOAD |
| 3 | Garshin O.O., Startseva Z.A. (2019) Experimental technique of the coal-water pulp dewatering at S.M. Kirov mine’s concentrating plant, Journal of Mining and Geotechnical Engineering, 2(5):33. DOI: 10.26730/2618-7434-2019-2-33-41 | MORE INFO | DOWNLOAD |
| 4 | Ermolaev V.A., Selyukov A.V. (2019) Modeling of the composition and interrelation of the elements of the open pit mine production process, Journal of Mining and Geotechnical Engineering, 2(5):42. DOI: 10.26730/2618-7434-2019-2-42-55 | MORE INFO | DOWNLOAD |
| 5 | Abu-Abed F.N., Naumova L.G. (2019) IT-technologies in technological process automation in mining, Journal of Mining and Geotechnical Engineering, 3(6):21. DOI: 10.26730/2618-7434-2019-3-21-35 | MORE INFO | DOWNLOAD |
| 6 | Gogolin V.A., Lesin Yu.V., Litvin O.I., Litvin Ya.O. (2021) Hydrofilling of the reclamation layer for recovery of disturbed lands at Kuzbass open pit mines, Journal of Mining and Geotechnical Engineering, 1(12):69. DOI: 10.26730/2618-7434-2021-1-69-86 | MORE INFO | DOWNLOAD |
| 7 | Gerike P.B., Gerike B.L., Shakhmanov V.N. (2021) Selection and justification of criterion for diagnostics misalignment of shaft lines of quarry excavators, Journal of Mining and Geotechnical Engineering, 3(14):50. DOI: 10.26730/2618-7434-2021-3-50-60 | MORE INFO | DOWNLOAD |
| 8 | Gerike P., Gerike B. (2022) Prediction of the service life of mining equipment with the use of a unified diagnostic criterion of its technical condition, Journal of Mining and Geotechnical Engineering, 3(18):4. DOI: 10.26730/2618-7434-2022-3-4-24 | MORE INFO | DOWNLOAD |
| 9 | Efremenkov A.B., Korneyev P.A., Korneyev V.A., Khoreshok A.A., Mametyev L.Y. (2022) Improving the efficiency of drilling operations in coal mines during anchoring of mine workings, Journal of Mining and Geotechnical Engineering, 4(19):62. DOI: 10.26730/2618-7434-2022-4-62-72 | MORE INFO | DOWNLOAD |
| 10 | Tyulenev M.A., Markov S.O., Katsubin A.V., Aksenov V.V., Dubinkin S.D. (2023) To define the application area of unmanned quarry dump trucks with payload capacity of 220 tons, Journal of Mining and Geotechnical Engineering, 4(23):91. DOI: 10.26730/2618-7434-2023-4-91-102 | MORE INFO | DOWNLOAD |
| 11 | Karpov V.N., Konurin A.I., Orlov D.V. (2024) Experience and perspectives of application of research methods of rock mechanical destruction processes during drilling of wells , Journal of Mining and Geotechnical Engineering, 2(25):41. DOI: 10.26730/2618-7434-2024-2-41-78 | MORE INFO | DOWNLOAD |
| 12 | Mametyev L.E., Khoreshok A.A., Tsekhin A.M., Borisov A.Yu. (2024) Improvement of horizontal well drilling technologies and operating equipment of auger machines, Journal of Mining and Geotechnical Engineering, 3(26):4. DOI: 10.26730/2618-7434-2024-3-4-21 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.