logo

Search of articles

Reset

Search result

Найдено: 5
1Ermolaev V.A., Selyukov A.V. (2021) Development of a methodology for evaluation of the state of mining operations of open pit mines to determine their coal mining capabilities, Journal of Mining and Geotechnical Engineering, 3(14):4. DOI: 10.26730/2618-7434-2021-3-4-49 MORE INFO DOWNLOAD
2Visnap A.A., Tyulenev M.A. (2023) Technological ESG transformation of the surface mining system in the circumstances of an operating mining company , Journal of Mining and Geotechnical Engineering, 3(22):4. DOI: 10.26730/2618-7434-2023-3-4-15 MORE INFO DOWNLOAD
3Dubinkin D.M., Markov S.O., Khoreshok A.A., Ismailova S.Y. (2023) Study of the influence of the bench height change on the current stripping ratio when using autonomous quarry dump trucks with payload capacity of 240 tons, Journal of Mining and Geotechnical Engineering, 3(22):71. DOI: 10.26730/2618-7434-2023-3-71-81 MORE INFO DOWNLOAD
4Kuznetsov I.S., Zinoviev V.V., Kuznetsova A.V. (2024) Identification of the type of probabilistic distribution of the main technological processes duration when modeling stripping operations at Kuzbass open-pit mines , Journal of Mining and Geotechnical Engineering, 2(25):79. DOI: 10.26730/2618-7434-2024-2-79-103 MORE INFO DOWNLOAD
5Kolesnikov V.F., Litvin Ya.O., Dubinkin D.M., Markov S.O. (2024) On determining the parameters of technological schemes of overburden bench mining by different excavators and dump trucks, Journal of Mining and Geotechnical Engineering, 3(26):99. DOI: 10.26730/2618-7434-2024-3-99-112 MORE INFO DOWNLOAD

Обложка

This work is licensed under a Creative Commons Attribution 4.0 License.