logo

Search of articles

Reset

Search result

Найдено: 4
1Gerike B.L., Klishin V.I., Gerike P.B., Mokrushev A.A. (2018) Intelligent service of reducers of mining machines, Journal of Mining and Geotechnical Engineering, 1(1):19. DOI: 10.26730/2618-7434-2018-1-19-34 MORE INFO DOWNLOAD
2Gerike B., Drozdenko Yu., Kopytin D. (2020) Complexes of deep seam mining: review of application and study of their technical condition, Journal of Mining and Geotechnical Engineering, 3(10):58. DOI: 10.26730/2618-7434-2020-3-58-78 MORE INFO DOWNLOAD
3Mironenko I.A. (2020) Influence of Mining and Technical Conditions on Pa-rameters of Hydrodump Rock Respoiling Technology for Joint Mining by Jetting Erosion and Hydraulic Dredge, Journal of Mining and Geotechnical Engineering, 4(11):70. DOI: 10.26730/2618-7434-2020-4-70-79 MORE INFO DOWNLOAD
4Gerike P., Gerike B. (2022) Prediction of the service life of mining equipment with the use of a unified diagnostic criterion of its technical condition, Journal of Mining and Geotechnical Engineering, 3(18):4. DOI: 10.26730/2618-7434-2022-3-4-24 MORE INFO DOWNLOAD

Обложка

This work is licensed under a Creative Commons Attribution 4.0 License.