| 1 | Ananyev K.A., Ermakov A.N., Khoreshok A.A., Sidorov M.S., Otchaykin M.S. (2023) Assessment of the possibility of using raise boring machines as technical means to create stacked boreholes in the coal mines of Kuzbass, Journal of Mining and Geotechnical Engineering, 2(21):4. DOI: 10.26730/2618-7434-2023-2-4-25 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Dubinkin D.M., Markov S.O., Khoreshok A.A., Ismailova S.Y. (2023) Study of the influence of the bench height change on the current stripping ratio when using autonomous quarry dump trucks with payload capacity of 240 tons, Journal of Mining and Geotechnical Engineering, 3(22):71. DOI: 10.26730/2618-7434-2023-3-71-81 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.