| 1 | Ananyev K.A., Ermakov A.N., Khoreshok A.A., Sidorov M.S., Otchaykin M.S. (2023) Assessment of the possibility of using raise boring machines as technical means to create stacked boreholes in the coal mines of Kuzbass, Journal of Mining and Geotechnical Engineering, 2(21):4. DOI: 10.26730/2618-7434-2023-2-4-25 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Kolesnikov V.F., Koryakin A.I., Ermolaev V.A., Voronkov V.F. (2023) Creation of excavation and loading complexes and technological schemes of mining operations in coal-bearing zones of open-pit mines, Journal of Mining and Geotechnical Engineering, 2(21):26. DOI: 10.26730/2618-7434-2023-2-26-58 | MORE INFO | DOWNLOAD |
| 3 | Ignatov E.V., Tyulenev M.A. (2023) Geotechnical justification of geometrical and techno-logical parameters of the «long strips with shortwalls» mining system, Journal of Mining and Geotechnical Engineering, 2(21):59. DOI: 10.26730/2618-7434-2023-2-59-87 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.