| 1 | Khoreshok A.A., Dubinkin D.M., Zelyaeva E.A. (2022) Overview of bearing systems (frames) constructions of dump trucks with payload capacity up to 110 tons, Journal of Mining and Geotechnical Engineering, 1(16):4. DOI: 10.26730/2618-7434-2022-1-4-15 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Elebo A., Onyekwere O., Hassan N.M., Ottah S.O., Bando D.C., Tutuwa A.J., Ugochukwu V.U., Anigbo G.C., Nuhu I. (2022) Bioremediation of crude oil contaminated soil using blended mixtures of fish and piggery wastes as bio-stimulating agents, Journal of Mining and Geotechnical Engineering, 1(16):16. DOI: 10.26730/2618-7434-2022-1-16-30 | MORE INFO | DOWNLOAD |
| 3 | Skursky M.D. (2022) On the material composition of coals, Journal of Mining and Geotechnical Engineering, 1(16):31. DOI: 10.26730/2618-7434-2022-1-31-82 | MORE INFO | DOWNLOAD |
| 4 | Dubinkin D., Arutyunyan G., Nazarenko S., Yalyshev A. (2022) Analysis and prospects of domestic internal combustion engine application for 240-ton autonomous dump truck, Journal of Mining and Geotechnical Engineering, 2(17):4. DOI: 10.26730/2618-7434-2022-2-4-21 | MORE INFO | DOWNLOAD |
| 5 | Dubinkin D., Sadovets V., Kartashov A., Gazizullin R., Kiselev P., Popov I. (2022) Analysis and prospects of domestic traction drive application for 240-ton autonomous dump truck, Journal of Mining and Geotechnical Engineering, 2(17):22. DOI: 10.26730/2618-7434-2022-2-22-36 | MORE INFO | DOWNLOAD |
| 6 | Pashkov D., Moiseev M., Kozlov R. (2022) Variants of brake systems of dump trucks with payload capacity from 218 to 255 tons, Journal of Mining and Geotechnical Engineering, 2(17):37. DOI: 10.26730/2618-7434-2022-2-37-52 | MORE INFO | DOWNLOAD |
| 7 | Syrkin I., Buzunov N., Turgenev I. (2022) Battery sizes of low-voltage electrical equipment of dump trucks with payload capacity from 218 to 255 tons, Journal of Mining and Geotechnical Engineering, 2(17):53. DOI: 10.26730/2618-7434-2022-2-53-66 | MORE INFO | DOWNLOAD |
| 8 | Kozlov I., Sadovets R., Sadovets V. (2022) Development of a methodology for making a solid model of the knife executive body of the geokhod, Journal of Mining and Geotechnical Engineering, 2(17):67. DOI: 10.26730/2618-7434-2022-2-67-86 | MORE INFO | DOWNLOAD |
| 9 | Gerike P., Gerike B. (2022) Prediction of the service life of mining equipment with the use of a unified diagnostic criterion of its technical condition, Journal of Mining and Geotechnical Engineering, 3(18):4. DOI: 10.26730/2618-7434-2022-3-4-24 | MORE INFO | DOWNLOAD |
| 10 | Arutyunyan G., Kartashov A., Gazizullin R., Kiselev P., Zaitsev A., Tarasyuk I. (2022) Selection of a rational type of front suspension for min-ing dump trucks with payload capacity up to 240 tons, Journal of Mining and Geotechnical Engineering, 3(18):25. DOI: 10.26730/2618-7434-2022-3-25-40 | MORE INFO | DOWNLOAD |
| 11 | Ismailova Sh., Zakrasovsky D. (2022) Application of 3D-scanning technology in the creation of quarry dump trucks, Journal of Mining and Geotechnical Engineering, 3(18):41. DOI: 10.26730/2618-7434-2022-3-41-52 | MORE INFO | DOWNLOAD |
| 12 | Martyanov V., Kolesnikov V., Lapaev M. (2022) Investigation of drilling and blasting works parameters for the combined technology of open pit mining of inclined deposits, Journal of Mining and Geotechnical Engineering, 3(18):53. DOI: 10.26730/2618-7434-2022-3-53-78 | MORE INFO | DOWNLOAD |
| 13 | Tyulenev M.A., Markov S.O., Gvozdkova T.N., Palamarchuk A.B., Seleznev A.V., Suradeev N.S., Esin D.D. (2022) Study of structures of excavation schemes for backfilling of internal multi-tier transportless dumps , Journal of Mining and Geotechnical Engineering, 4(19):4. DOI: 10.26730/2618-7434-2022-4-4-34 | MORE INFO | DOWNLOAD |
| 14 | Ananyev K.A., Ermakov A.A., Sidorov M.S., Varnavsky K.A. (2022) Overview of drilling rigs executive bodies, Journal of Mining and Geotechnical Engineering, 4(19):35. DOI: 10.26730/2618-7434-2022-4-35-61 | MORE INFO | DOWNLOAD |
| 15 | Efremenkov A.B., Korneyev P.A., Korneyev V.A., Khoreshok A.A., Mametyev L.Y. (2022) Improving the efficiency of drilling operations in coal mines during anchoring of mine workings, Journal of Mining and Geotechnical Engineering, 4(19):62. DOI: 10.26730/2618-7434-2022-4-62-72 | MORE INFO | DOWNLOAD |
| 16 | Suslina L.A., Agapova E.N., Bobrovnikova A.A. (2022) Improvement of preparation efficiency of 0.15 1 mm coal using hydrosizers, Journal of Mining and Geotechnical Engineering, 4(19):73. DOI: 10.26730/2618-7434-2022-4-73-81 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.