| 1 | Markov S.O., Tyulenev M.A., Kuzin E.G. (2018) Georadar research of the block structure for drilling and blasting operations on Zarechnyi open pit mine, Journal of Mining and Geotechnical Engineering, 1(1):56. DOI: 10.26730/2618-7434-2018-1-56-63 | MORE INFO | DOWNLOAD |
|---|---|---|---|
| 2 | Khoreshok A.A., Mametyev L.E., Tsekhin A.M., Borisov A.Yu. (2018) Prospects of disk tools using on executive bodies of mining machines, Journal of Mining and Geotechnical Engineering, 1(1):64. DOI: 10.26730/2618-7434-2018-1-64-80 | MORE INFO | DOWNLOAD |
| 3 | Kolesnikov V.F., Cehlár M., Tyuleneva E.A. (2018) Overview of excavation and loading operations in the coal-bearing zones at Kuzbass open pit mines, Journal of Mining and Geotechnical Engineering, 2(2):36. DOI: 10.26730/2618-7434-2018-2-36-49 | MORE INFO | DOWNLOAD |
| 4 | Sirota D.Yu., Babushkin M.A. (2018) The solving of some inverse problems for ordinary differential equation in engineering applications, Journal of Mining and Geotechnical Engineering, 2(2):65. DOI: 10.26730/2618-7434-2018-2-65-74 | MORE INFO | DOWNLOAD |
| 5 | Cehlár M., Rybár P., Mihók J., Engel J. (2019) On the issue of mineral reserves’ classification, Journal of Mining and Geotechnical Engineering, 1(4):4. DOI: 10.26730/2618-7434-2019-1-04-23 | MORE INFO | DOWNLOAD |
| 6 | Markov S.O., Tyulenev M.A., Aliyarov R.Yu. (2019) Creating of citations and references lists in scientific articles (on the example of publications on mining), Journal of Mining and Geotechnical Engineering, 1(4):69. DOI: 10.26730/2618-7434-2019-1-69-78 | MORE INFO | DOWNLOAD |
| 7 | Miliy S.M., Rozhenko M.A., Prokopenko K.A., Korotkova G.I. (2019) Methodology for identifying seams disturbance zones to increase the reliability of exploration data, Journal of Mining and Geotechnical Engineering, 2(5):4. DOI: 10.26730/2618-7434-2019-2-04-18 | MORE INFO | DOWNLOAD |
| 8 | Dubinkin D.M., Sadovets V.Yu., Kotiev G.O., Kartashov A.V. (2019) Overburden and coal transportation research at open pit mines, Journal of Mining and Geotechnical Engineering, 4(7):50. DOI: 10.26730/2618-7434-2019-4-50-66 | MORE INFO | DOWNLOAD |
| 9 | Cehlár M., Rybár P., Mihók J., Engel J. (2020) Analysis of investments in the mining industry, Journal of Mining and Geotechnical Engineering, 1(8):4. DOI: 10.26730/2618-7434-2020-1-4-31 | MORE INFO | DOWNLOAD |
| 10 | Miliy S.M. (2020) Evaluation of technology for development of inclined and steep coal deposits in Kuzbass, Journal of Mining and Geotechnical Engineering, 1(8):45. DOI: 10.26730/2618-7434-2020-1-45-73 | MORE INFO | DOWNLOAD |
| 11 | Makridin E.V., Tyulenev M.A., Markov S.O. (2020) Experimental study of the quarry wastewater filtering in coarse-grained massifs of rock debris at Kamyshansky open pit mine, Journal of Mining and Geotechnical Engineering, 2(9):4. DOI: 10.26730/2618-7434-2020-2-4-25 | MORE INFO | DOWNLOAD |
| 12 | Szurgacz, D., Diederichs, R., and Brzózka, M. (2020) The role and relevance of a double block in the hydraulic system of a powered roof support, Journal of Mining and Geotechnical Engineering, 3(10):4. DOI: 10.26730/2618-7434-2020-3-4-17 | MORE INFO | DOWNLOAD |
| 13 | Tyulenev M., Markov S., Palamarchuk A., Gvozdkova T. (2020) Direct dumping technology of stockpiled coal reserves mining along the seam VI at the Tomusinsky open pit mine, Journal of Mining and Geotechnical Engineering, 3(10):18. DOI: 10.26730/2618-7434-2020-3-18-57 | MORE INFO | DOWNLOAD |
| 14 | Dubinkin D., Aksenov V., Tyulenev M., Markov S. (2020) The influence of geotechnical factors on the output of quarry autonomous haul trucks, Journal of Mining and Geotechnical Engineering, 4(11):42. DOI: 10.26730/2618-7434-2020-4-42-69 | MORE INFO | DOWNLOAD |
| 15 | Ignatov E., Tyulenev M. (2021) Geomechanical regulations for the selection of element base parameters and their implementation in technical solutions, Journal of Mining and Geotechnical Engineering, 2(13):33. DOI: 10.26730/2618-7434-2021-2-33-63 | MORE INFO | DOWNLOAD |
| 16 | Dubinkin D.M., Yalyshev A.V. (2021) Analysis of constructions and justification for the use of loading platforms for 90-ton quarry dump trucks , Journal of Mining and Geotechnical Engineering, 3(14):61. DOI: 10.26730/2618-7434-2021-3-61-78 | MORE INFO | DOWNLOAD |
| 17 | Skursky M., Veits R., Voznaya A., Gribanova G., Kizhaeva N. (2021) Sedimentary continental mechanogenic terrigenous formations of placer mineral deposits, Journal of Mining and Geotechnical Engineering, 4(15):4. DOI: 10.26730/2618-7434-2021-4-4-39 | MORE INFO | DOWNLOAD |
| 18 | Martyanov V., Markov S., Kolesnikov V., Tyuleneva E., Cehlár M., Janočko J., Márasová D., Cagáňová D. (2021) Study of inclined deposits opening under the combined mining system: Kureinsky area case-study, Journal of Mining and Geotechnical Engineering, 4(15):64. DOI: 10.26730/2618-7434-2021-4-64-88 | MORE INFO | DOWNLOAD |
| 19 | Khoreshok A.A., Dubinkin D.M., Zelyaeva E.A. (2022) Overview of bearing systems (frames) constructions of dump trucks with payload capacity up to 110 tons, Journal of Mining and Geotechnical Engineering, 1(16):4. DOI: 10.26730/2618-7434-2022-1-4-15 | MORE INFO | DOWNLOAD |
| 20 | Elebo A., Onyekwere O., Hassan N.M., Ottah S.O., Bando D.C., Tutuwa A.J., Ugochukwu V.U., Anigbo G.C., Nuhu I. (2022) Bioremediation of crude oil contaminated soil using blended mixtures of fish and piggery wastes as bio-stimulating agents, Journal of Mining and Geotechnical Engineering, 1(16):16. DOI: 10.26730/2618-7434-2022-1-16-30 | MORE INFO | DOWNLOAD |
| 21 | Skursky M.D. (2022) On the material composition of coals, Journal of Mining and Geotechnical Engineering, 1(16):31. DOI: 10.26730/2618-7434-2022-1-31-82 | MORE INFO | DOWNLOAD |
| 22 | Pashkov D., Moiseev M., Kozlov R. (2022) Variants of brake systems of dump trucks with payload capacity from 218 to 255 tons, Journal of Mining and Geotechnical Engineering, 2(17):37. DOI: 10.26730/2618-7434-2022-2-37-52 | MORE INFO | DOWNLOAD |
| 23 | Martyanov V., Kolesnikov V., Lapaev M. (2022) Investigation of drilling and blasting works parameters for the combined technology of open pit mining of inclined deposits, Journal of Mining and Geotechnical Engineering, 3(18):53. DOI: 10.26730/2618-7434-2022-3-53-78 | MORE INFO | DOWNLOAD |
| 24 | Tyulenev M.A., Markov S.O., Gvozdkova T.N., Palamarchuk A.B., Seleznev A.V., Suradeev N.S., Esin D.D. (2022) Study of structures of excavation schemes for backfilling of internal multi-tier transportless dumps , Journal of Mining and Geotechnical Engineering, 4(19):4. DOI: 10.26730/2618-7434-2022-4-4-34 | MORE INFO | DOWNLOAD |
| 25 | Ananyev K.A., Ermakov A.A., Sidorov M.S., Varnavsky K.A. (2022) Overview of drilling rigs executive bodies, Journal of Mining and Geotechnical Engineering, 4(19):35. DOI: 10.26730/2618-7434-2022-4-35-61 | MORE INFO | DOWNLOAD |
| 26 | Ananyev K.A., Ermakov A.N., Khoreshok A.A., Sidorov M.S., Otchaykin M.S. (2023) Assessment of the possibility of using raise boring machines as technical means to create stacked boreholes in the coal mines of Kuzbass, Journal of Mining and Geotechnical Engineering, 2(21):4. DOI: 10.26730/2618-7434-2023-2-4-25 | MORE INFO | DOWNLOAD |
| 27 | Ignatov E.V., Tyulenev M.A. (2023) Geotechnical justification of geometrical and techno-logical parameters of the «long strips with shortwalls» mining system, Journal of Mining and Geotechnical Engineering, 2(21):59. DOI: 10.26730/2618-7434-2023-2-59-87 | MORE INFO | DOWNLOAD |
| 28 | Visnap A.A., Tyulenev M.A. (2023) Technological ESG transformation of the surface mining system in the circumstances of an operating mining company , Journal of Mining and Geotechnical Engineering, 3(22):4. DOI: 10.26730/2618-7434-2023-3-4-15 | MORE INFO | DOWNLOAD |
| 29 | Potashnikov M.D., Muravev A.S., Kartashov A.B., Pikalov N.A., Nazarenko S.V. (2023) Formation of an approach to the processing of statistical data on vehicle movements , Journal of Mining and Geotechnical Engineering, 3(22):34. DOI: 10.26730/2618-7434-2023-3-34-50 | MORE INFO | DOWNLOAD |
| 30 | Dubinkin D.M., Markov S.O., Khoreshok A.A., Ismailova S.Y. (2023) Study of the influence of the bench height change on the current stripping ratio when using autonomous quarry dump trucks with payload capacity of 240 tons, Journal of Mining and Geotechnical Engineering, 3(22):71. DOI: 10.26730/2618-7434-2023-3-71-81 | MORE INFO | DOWNLOAD |
| 31 | Rakhaev S.M, Gazizullin R.L., Kartashov A.B., Dubinkin D.M., Zelyaeva E.A. (2023) Selection of load conditions at the initial stages of load-bearing systems (frames) designing of mining dump trucks, Journal of Mining and Geotechnical Engineering, 4(23):41. DOI: 10.26730/2618-7434-2023-4-41-55 | MORE INFO | DOWNLOAD |
| 32 | Kartashov A.B., Arytyunyan G.A., Dubinkin D.M., Kiselev P.I, Zaitsev A.A., Popov I.P., Tarasyuk I.A. (2023) Synthesis of rational parameters of telescopic suspension and steering systems of a dump truck with carrying capacity up to 240 tons, Journal of Mining and Geotechnical Engineering, 4(23):56. DOI: 10.26730/2618-7434-2023-4-56-75 | MORE INFO | DOWNLOAD |
| 33 | Dubinkin D.M., Ismailova Sh.Ya., Yalyshev A.V. (2023) Determination of overburden model parameters for simulation modeling of loading and unloading of rock cargo platform of quarry dump truck, Journal of Mining and Geotechnical Engineering, 4(23):76. DOI: 10.26730/2618-7434-2023-4-76-90 | MORE INFO | DOWNLOAD |
| 34 | Tyulenev M.A., Markov S.O., Katsubin A.V., Aksenov V.V., Dubinkin S.D. (2023) To define the application area of unmanned quarry dump trucks with payload capacity of 220 tons, Journal of Mining and Geotechnical Engineering, 4(23):91. DOI: 10.26730/2618-7434-2023-4-91-102 | MORE INFO | DOWNLOAD |
| 35 | Dubinkin D.M., Ismailova Sh.Ya., Yalyshev A.V. (2023) Influence of overburden loading sequence on load capacity utilization factor of dump truck BelAZ-75310 (240 tons), Journal of Mining and Geotechnical Engineering, 4(23):103. DOI: 10.26730/2618-7434-2023-4-103-118 | MORE INFO | DOWNLOAD |
| 36 | Shaklein S.V., Pisarenko M.V., Rogova T.B. (2024) Trends in the mineral resource base development of the Kuzbass coal industry, Journal of Mining and Geotechnical Engineering, 1(24):4. DOI: 10.26730/2618-7434-2024-1-4-22 | MORE INFO | DOWNLOAD |
| 37 | Dubov G.M., Bogomolov A.R., Dvorovenko I.V., Azikhanov S.S., Zyryanov I.V., Sleptsova E.V., Nikiforova M.N., Logvinov I.A., Popov D.K. (2024) Research of the component composition of compressed natural gas under variable thermobaric conditions of its application as a motor fuel in technological transport of JSC «ALROSA» in the conditions of Yakutia, Journal of Mining and Geotechnical Engineering, 1(24):23. DOI: 10.26730/2618-7434-2024-1-23-42 | MORE INFO | DOWNLOAD |
| 38 | Murko E.V., Markov S.O., Tyulenev M.A. (2024) Study of concentrating plants’ coal slurry dewatering, Journal of Mining and Geotechnical Engineering, 1(24):58. DOI: 10.26730/2618-7434-2024-1-58-76 | MORE INFO | DOWNLOAD |
| 39 | Chernikova T.M., Dabarov V.V., Kachenkov A.K. (2024) Increasing the energy efficiency of asynchronous motors, Journal of Mining and Geotechnical Engineering, 1(24):77. DOI: 10.26730/2618-7434-2024-1-77-86 | MORE INFO | DOWNLOAD |
| 40 | Grigoryev A.V., Zakharov A.Y., Zakharova A.G., Shauleva N.M., Shaulev A.A. (2024) Justification of design of impulses transmitter and receiver of longitudinal breakage detection device of a conveyor belt, Journal of Mining and Geotechnical Engineering, 2(25):4. DOI: 10.26730/2618-7434-2024-2-4-23 | MORE INFO | DOWNLOAD |
| 41 | Chen Q., Luo T., Khoreshok A.A., Varnavskiy K.A., Liu P., Kalabukhov D.M., Xi T., Wu G. (2024) Research and design of a movement coordination controller in the human-machine system for active assisted exoskeleton robot for mining, Journal of Mining and Geotechnical Engineering, 2(25):24. DOI: 10.26730/2618-7434-2024-2-24-40 | MORE INFO | DOWNLOAD |
| 42 | Lapaev M.N., Gogolin V.A., Dubinkin D.M., Markov S.O., Tyulenev M.A. (2024) Modeling of face block parameters in different mining and geological conditions when using backhoes and dump trucks with 240 tons payload capacity, Journal of Mining and Geotechnical Engineering, 2(25):104. DOI: 10.26730/2618-7434-2024-2-104-116 | MORE INFO | DOWNLOAD |
| 43 | Mametyev L.E., Khoreshok A.A., Tsekhin A.M., Borisov A.Yu. (2024) Improvement of horizontal well drilling technologies and operating equipment of auger machines, Journal of Mining and Geotechnical Engineering, 3(26):4. DOI: 10.26730/2618-7434-2024-3-4-21 | MORE INFO | DOWNLOAD |
| 44 | Kolesnikov V.F., Litvin Ya.O., Dubinkin D.M., Markov S.O. (2024) On determining the parameters of technological schemes of overburden bench mining by different excavators and dump trucks, Journal of Mining and Geotechnical Engineering, 3(26):99. DOI: 10.26730/2618-7434-2024-3-99-112 | MORE INFO | DOWNLOAD |
| 45 | Dubinkin D.M., Ismailova Sh.Ya. (2024) Technical solutions for cargo platforms (dump truck bodies) of mining dump trucks as an intellectual property item, Journal of Mining and Geotechnical Engineering, 4(27):4. DOI: 10.26730/2618-7434-2024-4-4-29 | MORE INFO | DOWNLOAD |
| 46 | Naumov M.A., Karpovsky A.Yu., Kurnosov V.G. (2024) Study of the effect of propagation coefficient on distance, time and data rate of LoRa wireless communication, Journal of Mining and Geotechnical Engineering, 4(27):30. DOI: 10.26730/2618-7434-2024-4-30-46 | MORE INFO | DOWNLOAD |
| 47 | Bokarev A.I., Dianov V.A., Kartashov A.B., Arutyunyan G.A., Dubinkin D.M., Pashkov D.A. (2024) Operation process analysis of BELAZ-7531 mining dump trucks , Journal of Mining and Geotechnical Engineering, 4(27):66. DOI: 10.26730/2618-7434-2024-4-66-79 | MORE INFO | DOWNLOAD |
| 48 | Pisarenko M.V., Aksenov V.V., Shaklein S.V. (2024) Taxation of coal mining: problems and solutions, Journal of Mining and Geotechnical Engineering, 4(27):80. DOI: 10.26730/2618-7434-2024-4-80-98 | MORE INFO | DOWNLOAD |
| 49 | Zakrasovsky D.I., Tarasyuk I.A., Safina D.A., Ovsyannikov M.O., Nedobezhkin V.G. (2024) Comparative assessment of the loads on the front axle wheel mounting elements of an autonomous mining dump truck with a payload capacity of 240 tons and BelAZ-7531, Journal of Mining and Geotechnical Engineering, 4(27):99. DOI: 10.26730/2618-7434-2024-4-99-113 | MORE INFO | DOWNLOAD |
| 50 | Reshetnyak S.N., Lebedev G.M., Mametyev L.E., Chernikova T.M. (2025) Technical and economic assessment of the influence of higher harmonic components on the efficiency of the electro-technical complex functioning of a coal mine, Journal of Mining and Geotechnical Engineering, 1(28):4. DOI: 10.26730/2618-7434-2025-1-4-21 | MORE INFO | DOWNLOAD |
| 51 | Kuznetsov M.A., Bakanov A.A. (2025) Study of geometrical parameters of drilling rig rotary tools , Journal of Mining and Geotechnical Engineering, 1(28):52. DOI: 10.26730/2618-7434-2025-1-52-69 | MORE INFO | DOWNLOAD |
| 52 | Baumgarten M.I., Galanina T.V. (2025) Analyzing the activities of environmental orientation of higher education institutions in the regions of the Russian Federation, Journal of Mining and Geotechnical Engineering, 1(28):91. DOI: 10.26730/2618-7434-2025-1-91-106 | MORE INFO | DOWNLOAD |
| 53 | Prostov S.M., Kalaigoroda V.V., Bushuev A.A. (2025) Volumetric physical modelling of geoelectric anomalies in the endogenous fire centre area, Journal of Mining and Geotechnical Engineering, 2(29):26. DOI: 10.26730/2618-7434-2025-2-26-39 | MORE INFO | DOWNLOAD |
| 54 | Grigoriev A.V., Zakharov A.Y., Zakharova A.G., Shaulev An.A., Eshchin E.K., Semykina I.Yu., Shaulev Al.A., Lebedev G.M. (2025) Research of the possibility of implementing the transmitter's induction power supply scheme of longitudinal breakage detection device on a conveyor belt, Journal of Mining and Geotechnical Engineering, 2(29):84. DOI: 10.26730/2618-7434-2025-2-84-99 | MORE INFO | DOWNLOAD |
This work is licensed under a Creative Commons Attribution 4.0 License.